Advice
Mass panel installation advice: — Full scale mockup is a benefit, allows best practices to be developed and solutions identified prior to construction. — “Install prefab guardrail systems between columns on the perimeter and pre-determine tie-off points for worker safety” — Manufacturers need to clearly identify and locate balanced panel lifting points. — Pre plan and optimize truck load stacks, delivery schedules and erection sequencing