Plan sequencing for fast placements. Connections often don’t work as a result of placement sequence. For example, more expensive connections can be used (eg Megant-style) where the assembly order doesn’t matter, but if cost is saved on the connections, time is wasted on site with necessary last minute adjustments.
Other Articlees
Related Reading
Advice
Example of a mainly successful project: Brock Commons — involved a high degree of collaboration: Integrated Design Process — design offered 3-4 options for every connection, which every stakeholder vetted — invested in building a mock-up, where many problems were solved in advance of construction — the design worked with standard panel sizes
Advice
Tolerances are different for each different trade. Mitigate potential problems with communication in the procurement phase.