Plan sequencing for fast placements. Connections often don’t work as a result of placement sequence. For example, more expensive connections can be used (eg Megant-style) where the assembly order doesn’t matter, but if cost is saved on the connections, time is wasted on site with necessary last minute adjustments.
Other Articlees
Related Reading

Image c/o: KK Law
Advice
Example of a mainly successful project: Brock Commons — involved a high degree of collaboration: Integrated Design Process — design offered 3-4 options for every connection, which every stakeholder vetted — invested in building a mock-up, where many problems were solved in advance of construction — the design worked with standard panel sizes
Advice
Tolerances are different for each different trade. Mitigate potential problems with communication in the procurement phase.