Focus in

All News

Roles

Phases

Advice

Reasons to engage the services of a CLT installer during design: — gives rigour to cost and scope — gets structural modelling info and connection details — provides site sequencing and mobilization info — provides contractor costs for installation

Advice

Specs are often poorly organized on mass timber projects, resulting in discrepancies between general notes, specs, instructions, and expectations. Do not copy and paste from old doculments just because mass timber is a material that people are unfamiliar with. Throw away the old and start by stating assumptions.

Advice

Costs can easily inflate for MEP (mechanical, electrical, plumbing). Contractors go to suppliers for pricing, suppliers add contingency costs, contractors add their own contingency, and the cost can inflate enough to kill the project.

Advice

Spec a target tolerance. Contractually this is difficult to hold to, but provides a method to explain the importance of the allowable tolerance.

Advice

Mass panel installation advice: — Full scale mockup is a benefit, allows best practices to be developed and solutions identified prior to construction. — “Install prefab guardrail systems between columns on the perimeter and pre-determine tie-off points for worker safety” — Manufacturers need to clearly identify and locate balanced panel lifting points. — Pre plan and optimize truck load stacks, delivery schedules and erection sequencing