Specs should request written description of moisture protection protocol (submitted prior to CLT delivery), describing protection implementation plan for each stage:
- delivery
- storage
- installation (roof & floor panels)
- after installation (walls)
- ongoing moisture protection measures until exterior envelope is watertight
- remedial measures for panels damaged and/or stained during installation