Specs should request written description of moisture protection protocol (submitted prior to CLT delivery), describing protection implementation plan for each stage:

  • delivery
  • storage
  • installation (roof & floor panels)
  • after installation (walls)
  • ongoing moisture protection measures until exterior envelope is watertight
  • remedial measures for panels damaged and/or stained during installation