The installer should be talking to consultants. Do not rely on the manufacturer to know the details for installation.
Other Articlees
Related Reading
![](https://masstimberplanning.ca/wp-content/uploads/2021/03/Brock_Commons_Tallwood_House_KK-Law-2.jpg)
Image c/o: KK Law
Advice
Example of a mainly successful project: Brock Commons — involved a high degree of collaboration: Integrated Design Process — design offered 3-4 options for every connection, which every stakeholder vetted — invested in building a mock-up, where many problems were solved in advance of construction — the design worked with standard panel sizes
Advice
Tolerances are different for each different trade. Mitigate potential problems with communication in the procurement phase.