The installer should be thought of as a consultant and a vital team member. For example, when installers are brought to the table at the design phase and give input into connection details, constructibility improves. However, when the installer is brought on too late, other consultants have already spent the money, and no one wants to add to the cost. The resulting problems need to be solved on site by the installer, adding time and cost.