Mass panel installation advice:

  • Full scale mockup is a benefit, allows best practices to be developed and solutions identified prior to construction.
  • “Install prefab guardrail systems between columns on the perimeter and pre-determine tie-off points for worker safety”
  • Manufacturers need to clearly identify and locate balanced panel lifting points.
  • Pre plan and optimize truck load stacks, delivery schedules and erection sequencing